About this project
Summary of work
In 2028, MnDOT plans to replace the eastbound I-90 bridge over Freeborn County Road 46. We'll also make improvements on the eastbound exit ramp.
The bridge was built in 1967 and has deteriorated to a point where it should be replaced. A deceleration lane across this bridge will be added to allow vehicles to slow before the exit. The shoulders will also be widened.
