We are rebuilding Hwy 12 near downtown Wayzata between Shoreline Dr./Co. Rd. 15 and Central Ave. North/Co. Rd. 101. Originally built in 1970, this section of Hwy 12 needs to be replaced to continue to serve residents and those that use the highway.
We are repaving Hwy 12, replacing lighting, and making accessibility improvements between Central Ave. North/Co. Rd. 101 in Wayzata and I-494 in Minnetonka. We will also be repairing ramps along this section of Hwy 12.
When work is finished, Hwy 12 will have a smoother road surface, improved lighting and visibility for motorists, and accessible sidewalks and bike paths.
All traffic impacts are tentative and weather dependent.
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect road, ramp, bridge and lane closures during construction. Up to 20 ramps will be closed during the construction season. There will be weekend closures on Hwy 12 between Central Ave./Co. Rd. 101 and I-494 before Memorial Day or after Labor Day.
Lane closures
Early to mid-April
Hwy 12 is reduced to two lanes in both directions between Shoreline Dr. and Central Ave./Co. Rd. 101
Late April through fall
Hwy 12 is reduced to two lanes in both directions between Central Ave./Co. Rd. 101 and I-494
Late April through fall; Weekly Monday through Friday
Eastbound Hwy 12 is reduced to two lanes between Central Ave./Co. Rd. 101 and Shoreline Dr. during morning rush hour and reduced to one lane during evening rush hour
Westbound Hwy 12 is reduced to one lane between Shoreline Dr. and Central Ave./Co.Rd. 101 during morning rush hour and reduced to two lanes during evening rush hour
A moveable barrier system will be used for most of the construction season to shift lanes during peak travel times